AUS01 - Antara Living - Olympic Park - 공공 프로젝트 현장
-
16th 9월 2024, Daily Prestart
All workers have to Sign in daily
- Peno covers must not be removed, Decode staff must be informed and appropriate exclusion zones or edge protection put in place before removal
-Exclusion zone levels, 7 & 8,9,10 only form workers and scaffolders
-Mobile plant in use basement levels B1, B2, B3
-Exclusion zones in place
-Mobile plant in operation marked blue
- All site access to be clean and clear
- PPE to be worn at all times on-site
- All power tools and leads to be tagged
- No Tolerance for any violent behavior
- Any incident that occurs must be reported to the site office
- Be aware of mobile plant and crane movement
- Please be aware of traffic when crossing the road from the office into the job site
- Use lead stands at all times
- Falling from Heights!!!! make sure all handrails are installed on every edge, only authorized personnel can remove handrails
- All subcontractors must clean their working areas daily
- All the trades on deck have to coordinate with each other during the work and work around each other without interrupting the job
- All sediment control bags are to be checked daily
- permits must be submitted and approved before any hot works activities stripping activities and any other activities that require permits if you are unsure speak to a decode representative
- nurse calls are in place on all stair landings
- The emergency assembly point is near the access gate on Murray Rose Ave next to the hoist
- no smoking on site
- new SDS must be uploaded as required
- new equipment must be inducted into the site
Daily Pre-Start Content:
Hazards:
Form workers starting level 12 deck
Peno covers can not be removed
Mobile plant in use basement levels
No access to levels -8-9-10-11under formwork form worker only
Exclusion zones in place marked red
Mobile plant in operation marked blue
PT working on level 12
Plumbers level 4roughing in
Gyprockers level 6 framing
steel fixers top reo
Pouring vertical level 11 to 12
footpath closed -
25th 7월 2024,
Daily Pre-Start Content:
첨부 파일 :
PRIVATE CERTIFIER INSPECTION
-The exclusion zone on level 1 under the cup looks system
-Exclusion zone levels, 6, 7 & 8 only form workers and scaffolders
-Mobile plant in use basement levels B1, B2, B3
-Exclusion zones in place
-Mobile plant in operation marked blue
- All site access to be clean and clear
- PPE to be worn at all times on-site
- All power tools and leads to be tagged
- No Tolerance for any violent behavior
- Any incident that occurs must be reported to the site office
- Be aware of mobile plant and crane movement
- Please be aware of traffic when crossing the road from the office into the job site
- Use lead stands at all times
- Falling from Heights!!!! make sure all handrails are installed on every edge, only authorized personnel can remove handrails
- All subcontractors must clean their working areas daily
- All the trades on deck have to coordinate with each other during the work and work around each other without interrupting the job
- All sediment control bags are to be checked daily
- permits must be submitted and approved before any hot works activities stripping activities and any other activities that require permits if you are unsure speak to a decode representative
- nurse calls are in place on all stair landings
- The emergency assembly point is near the access gate on Murray Rose Ave next to the hoist
- no smoking on site
- new SDS must be uploaded as required
- new equipment must be inducted into the site
Daily Pre-Start Content:
Site Activities:
PRIVATE CERTIFIER INSPECTION
- Skyscraper fixing door frame on level 4 , 5
- Skyscraper to finish level 3, Hebel
- Skyscraper corking and installing bottom and top angle level 3
- Level 8 speed panel
- Block layers level 1
- Electrician level 3 roughing in
- Plumbers level 2 rough in and corking
- Mechanical level 2 & 3 roughing in
- water proofer level 2 - 3 - 4 - 5 joint seal and primer slab edge and hobs
- Steel fixes installing top steel on Level 09
- Formwork back propping level 05 up.
-Formworker start working on hobs and upturn.
- Painters working on the lift 3 patching level 5 soffit
-
Antara -Daily Pre-Start Notice Board - 24-07-24 Autosaved Autosaved.pdf
-
14th 6월 2024, Daily Pre-start
- cup lock system from levels 3 to 7
- Lovel 00 and level 1 Door installation
- level 00 - 1 waterproof preparation
- level 6 internal stud walls set out
- DA fire atrium install level 4
-FB masonry basement 1
SERVICES:
- Geminair level 00 level 5
- Azure plumbing level 4 - 5
- Ampcore level 1
_Da Fire level 4
Hazards
Exclusion zone level ,6,7 form workers and scaffolders only
Mobile plant in use basement levels
Exclusion zones in place
Mobile plant in operation marked blue
- Sign In, daily
- All site access to be clean and clear
- PPE to be worn at all times on-site
- All power tools and leads to be tagged
- No Tolerance for any violent behaviour
- Be aware of mobile plant and crane movement
- Please be aware of traffic when crossing the road from the office into the job site
- Use lead stands all times
- Falling from Heights!!!! make sure all handrails are installed on every edge, only authorized personnel can remove handrails
- All subcontractors must clean their working areas daily
- All the trades on deck have to coordinate between each other during the work and work around each other without interrupting of job progress
현재 현장 날씨
마지막 업데이트 날짜: 오후 11:21
온도: 20씨 (앱 20씨)
풍속: 13KMH
최대 풍속: 28KMH @오후 4:21
오전 9시부터 비가 내림: 12.2음음
최저 기온: 20씨 @오후 11:20
최고 온도: 32씨 @오후 12:37 2026-01-31
돌풍: 15KMH
최대 돌풍: 39KMH @오후 4:21
관찰 위치 - Sydney Olympic Park, NEW SOUTH WALES
시간대 - 오스트레일리아 동부 표준시
예측 - 일요일, 1 2월
Cloudy.
분: 17씨 맥스: 23씨
비 올 확률: 20%
예측 위치 - Sydney Olympic Park, NEW SOUTH WALES
시간대 - 오스트레일리아 동부 표준시
내일 - 월요일, 2 2월
Cloudy.
분: 18씨 맥스: 25씨
비 올 확률: 20%