PLA01 - Bellevue - Greenwich - Openbare Project Locatie
-
28th januari 2026, Pre start
#Toilets inside apartments are not to be used.
Bijlagen :
#Please adhere to exclusion zones
#All units require sign in. No shoes allowed in final cleaned apartments.
#Caution though out lobby's as final paint is completed
#anchor points have been installed on rooftop and balcony's for works that require being near a live edge (permits and harnesses are to be in place for these tasks)
#ladders are not to be used next to live edges on balcony's due to scaffold being dismantled to all elevations
#Please be mindful of silicosis, PPE and dust control must be actioned at all times (Crystalline silica.docx has been attached for your information)
#Work zone not valid on Bellevue Avenue, deliveries to be controlled and addressed to a Decode representative with sufficient notice.
#inslab Carbon fiber installation has been completed to existing structure, not to be penetrated/tampered with.
#PPE Must be adhered too at all times
#Housekeeping on a daily basis - Back charges will apply
#External waterproofing in progress to balcony's
#Finishing trades undertaking works in all unit's level 1,2,3,4,5,6,7 and rooftop
#Be mindful of vehicle movement
#Sign in and sign out Daily
#Leads are to elevated-utilize lead hooks/stands
#Corded tools to be tested and tagged
#Access ways to be clean and clear at all times
#Site inductions must be undertaken prior to the commencement of any works (7am start)
#Any permits required for specific tasks must be complete prior to the commencement of any works
366ee5a2-2539-48a2-9bee-d219659f90be.png
-
27th januari 2024, Exclusion zone to Gate 3
Hazard: Demolition works ongoing to level 3 West side structure.
Risk: whilst mitigation measures in place by way of catch deck on scaffold, risk of falling debris hence access and egress via gate 1 is not permitted (note spotter in place on Elcedo Lane. -
22nd november 2023, Daily Pre-start
All the workers must be inducted on site
All the workers must sign in and out
All the workers must have full P.P.E
All Plug in tools to be Tested and Tagged - Untagged equipment will not be allowed to be used onsite
—Daily Task:
- Soft Strip of Office building continues
- Soft Strip of Jay car site to begin
- All precautions to be taken while using Jaycar Drop zone
Exclusion area to have spotter in Jaycar site.
- Hording to be installed on Pacific Highway in front of Jaycar site scheduled for completion today.
Huidige weersomstandigheden op locatie
Laatst bijgewerkt om: 22:21
Temperatuur: 21C
Windsnelheid: 32KM/U
Max. Wind: 44KM/U @16:21
Regen sinds 9:00 uur: 0,0mm
Min.temp: 20C @21:31
Max.temp: 26C @11:24
Windvlaag: 35KM/U
Max. windvlaag: 48KM/U @16:21
Waarneming Locatie - Sydney Harbour, NEW SOUTH WALES
Tijdzone - Oost-Australische standaardtijd
Weerbericht - zondag, 1 februari
Cloudy.
Min.: 17C Max.: 24C
Kans op neerslag: 30%
Verwachte regen: 0 tot 1mm
Weerbericht locatie - Sydney, NEW SOUTH WALES
Tijdzone - Oost-Australische standaardtijd
Morgen - maandag, 2 februari
Cloudy.
Min.: 19C Max.: 26C
Kans op neerslag: 20%
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.
Weet u wat de PBM-vereisten voor deze locatie zijn?
Zorg dat u voor uw eerste dag op de locatie de juiste veiligheidsapparatuur hebt.
Begin sneller te werken zodra u op de locatie aankomt.
Voltooi uw locatieregistratie eenvoudig online en bespaar zo kostbare tijd.