PLA01 - Bellevue - Greenwich
Últimos Boletines
  • 28th enero 2026, Pre start

    #Toilets inside apartments are not to be used.
    #Please adhere to exclusion zones
    #All units require sign in. No shoes allowed in final cleaned apartments.
    #Caution though out lobby's as final paint is completed
    #anchor points have been installed on rooftop and balcony's for works that require being near a live edge (permits and harnesses are to be in place for these tasks)
    #ladders are not to be used next to live edges on balcony's due to scaffold being dismantled to all elevations
    #Please be mindful of silicosis, PPE and dust control must be actioned at all times (Crystalline silica.docx has been attached for your information)
    #Work zone not valid on Bellevue Avenue, deliveries to be controlled and addressed to a Decode representative with sufficient notice.
    #inslab Carbon fiber installation has been completed to existing structure, not to be penetrated/tampered with.
    #PPE Must be adhered too at all times
    #Housekeeping on a daily basis - Back charges will apply
    #External waterproofing in progress to balcony's
    #Finishing trades undertaking works in all unit's level 1,2,3,4,5,6,7 and rooftop
    #Be mindful of vehicle movement
    #Sign in and sign out Daily
    #Leads are to elevated-utilize lead hooks/stands
    #Corded tools to be tested and tagged
    #Access ways to be clean and clear at all times
    #Site inductions must be undertaken prior to the commencement of any works (7am start)
    #Any permits required for specific tasks must be complete prior to the commencement of any works

    Archivos adjuntos :
    366ee5a2-2539-48a2-9bee-d219659f90be.png
  • 27th enero 2024, Exclusion zone to Gate 3

    Hazard: Demolition works ongoing to level 3 West side structure.
    Risk: whilst mitigation measures in place by way of catch deck on scaffold, risk of falling debris hence access and egress via gate 1 is not permitted (note spotter in place on Elcedo Lane.

  • 22nd noviembre 2023, Daily Pre-start

    All the workers must be inducted on site
    All the workers must sign in and out
    All the workers must have full P.P.E

    All Plug in tools to be Tested and Tagged - Untagged equipment will not be allowed to be used onsite

    —Daily Task:
    - Soft Strip of Office building continues
    - Soft Strip of Jay car site to begin
    - All precautions to be taken while using Jaycar Drop zone
    Exclusion area to have spotter in Jaycar site.
    - Hording to be installed on Pacific Highway in front of Jaycar site scheduled for completion today.

Pronóstico del tiempo para la Obra
Tiempo en Obra actual

Última actualización el: 10:21 PM
Temperatura: 21C
Velocidad del viento: 32MPH
Máx. Viento: 44MPH @4:21 PM
Lluvia desde las 9 a.m.: 0.0mm
Temp mín: 20C @9:31 PM
Temp máx: 26C @11:24 AM
Ráfaga: 35MPH
Ráfagas máx: 48MPH @4:21 PM


Observación obtenida de - Bureau of Meteorology
Lugar de observación - Sydney Harbour, NEW SOUTH WALES
Zona horaria - hora estándar de Australia oriental
Pronóstico - domingo, 1 febrero

Cloudy.
Mín: 17C Máx: 24C
Probabilidad de lluvia: 30%
Se esperan precipitaciones: 0 para 1mm


Pronóstico obtenido de - Bureau of Meteorology
Lugar de la previsión - Sydney, NEW SOUTH WALES
Zona horaria - hora estándar de Australia oriental
Mañana - lunes, 2 febrero

Cloudy.
Mín: 19C Máx: 26C
Probabilidad de lluvia: 20%


Documentos importantes de la Obra
¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro

¿Primera vez en la Obra?

¿Conoce los requisitos de PPE para esta Obra?

Asegúrese de que cuento con el equipo de seguridad correcto para su primer día en la obra.

Ver los requisitos de PPE para la Obra

¿Primera vez en la Obra?

Empiece a trabajar en cuanto llegue a la obra.

Complete su registro de la obra en línea a su conveniencia y ahorre tiempo.

Comenzar registro

;