PLA01 - Bellevue - Greenwich - 公共プロジェクト現場
-
28th 1月 2026, Pre start
#Toilets inside apartments are not to be used.
添付ファイル :
#Please adhere to exclusion zones
#All units require sign in. No shoes allowed in final cleaned apartments.
#Caution though out lobby's as final paint is completed
#anchor points have been installed on rooftop and balcony's for works that require being near a live edge (permits and harnesses are to be in place for these tasks)
#ladders are not to be used next to live edges on balcony's due to scaffold being dismantled to all elevations
#Please be mindful of silicosis, PPE and dust control must be actioned at all times (Crystalline silica.docx has been attached for your information)
#Work zone not valid on Bellevue Avenue, deliveries to be controlled and addressed to a Decode representative with sufficient notice.
#inslab Carbon fiber installation has been completed to existing structure, not to be penetrated/tampered with.
#PPE Must be adhered too at all times
#Housekeeping on a daily basis - Back charges will apply
#External waterproofing in progress to balcony's
#Finishing trades undertaking works in all unit's level 1,2,3,4,5,6,7 and rooftop
#Be mindful of vehicle movement
#Sign in and sign out Daily
#Leads are to elevated-utilize lead hooks/stands
#Corded tools to be tested and tagged
#Access ways to be clean and clear at all times
#Site inductions must be undertaken prior to the commencement of any works (7am start)
#Any permits required for specific tasks must be complete prior to the commencement of any works
366ee5a2-2539-48a2-9bee-d219659f90be.png
-
27th 1月 2024, Exclusion zone to Gate 3
Hazard: Demolition works ongoing to level 3 West side structure.
Risk: whilst mitigation measures in place by way of catch deck on scaffold, risk of falling debris hence access and egress via gate 1 is not permitted (note spotter in place on Elcedo Lane. -
22nd 11月 2023, Daily Pre-start
All the workers must be inducted on site
All the workers must sign in and out
All the workers must have full P.P.E
All Plug in tools to be Tested and Tagged - Untagged equipment will not be allowed to be used onsite
—Daily Task:
- Soft Strip of Office building continues
- Soft Strip of Jay car site to begin
- All precautions to be taken while using Jaycar Drop zone
Exclusion area to have spotter in Jaycar site.
- Hording to be installed on Pacific Highway in front of Jaycar site scheduled for completion today.
現在の現場の天気
最終更新日時: 22:21
温度: 21C
風速: 32KMH
最大風速: 44KMH @16:21
午前9時からの雨: 0.0mm
最低気温: 20C @21:31
最高気温: 26C @11:24
突風: 35KMH
最大突風: 48KMH @16:21
観察場所 - Sydney Harbour, NEW SOUTH WALES
タイムゾーン - オーストラリア東部標準時
予測 - 日曜日, 1 2月
Cloudy.
分: 17C マックス: 24C
降雨の可能性: 30%パーセント
予想降雨量: 0 に 1mm
予測場所 - Sydney, NEW SOUTH WALES
タイムゾーン - オーストラリア東部標準時
明日 - 月曜日, 2 2月
Cloudy.
分: 19C マックス: 26C
降雨の可能性: 20%パーセント